Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9701491
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
- home > Supply > Wuhu Easy Shed Construction Single greenhouses greenhouses greenhouses steel construction budget
Information Name: | Wuhu Easy Shed Construction Single greenhouses greenhouses greenhouses steel construction budget |
Published: | 2013-09-01 |
Validity: | 30 |
Specifications: | |
Quantity: | 9000000.00 |
Price Description: | |
Detailed Product Description: | Including single greenhouses, simple shed, prefabricated galvanized steel sheds, cold shed, spring greenhouses are "early spring, late autumn," the wrong season cultivation in greenhouses, mostly using single-layer film covering, single building design, simple structure, investment is small, easy to operate, the winter without heating, now generally use the middle column-way construction, easy to cultivate, a large space. A skeleton part galvanized steel pipe: Diameter 20mm.22mm.25mm.30mm.32mm.42mm. Thickness: 1.0mm-2.0mm. Length: 4m-12.8m 2 standard steel shed specifications are: Center height 2.5 m, width (span) 6 m, length 30 m, an area of ??180 square meters. Skeleton of galvanized steel pipe: diameter 22 mm, wall thickness 1.5 mm. Depending on the topography can be adjusted appropriately. There 6,8,10 m span arch spacing of 0.6 - 1 meter high ridge with 2.5,2.8,3.1 m, span greater ridge height is higher. Three greenhouses Body: Arch Lever, longitudinal rods, oblique brace, shed door combination, shed head pole, slot and so on. Four main parts: tube tank holder, U-type card, top spring, slot connecting piece, arch pipe fittings, clamp ring, to hook, shaking film institutions. 5 greenhouses separation distance between. Generally adjacent to the interval between the two monomers shed at least 1.5 m distance, too small is not conducive to the greenhouse ventilation, drainage and lighting. Interval between two rows of greenhouses distance should be 2.5 m or more. If you have gutters shed head, then shed head distance from the ditches should be more than 1 meter. 6 arch tube, vertical rod and the slot installation step, mark the vertical Dagong tube is inserted along the eye of the depth to be consistent, hard terrain is slightly tilted inward place. The second step, mark each arch pipe buried depth. The third step, the two arches on the ground over the top tube connected, then erect, the arch tube is inserted into pre-drilled in the eyes. The fourth step in the shed two heads were inserted in the middle of a main entrance of the needle (must be vertical and horizontal). Then use the main entrance of the needle over the top of each arch on the butt into a vertical tube, and bring up a unified specified height. Fifth step is to install vertical support rod and cable-stayed, longitudinal rods were connected, so you can adjust and try to straighten it. The sixth step installation slot, and other cards. 7 films and film lamination line Installation overall requirement is sealed tight. The best choice when installing sunny windless morning, in one step. The temperature should not be too high, otherwise not easily taut. Circlip Karu Ka groove lamination, the correct method of operation is: put a retainer to twist around a mouth pressed into the slot slot, keeping in mind the mounting efforts to prevent the retainer is pressed in, in the slot mouth damage caused by the film. To reduce the retainer, the film slot friction, prevent the film from being damaged, the retainer mounted film and the film can be applied between the cushion layer of the old film, this layer can be reduced slot old film in the film in a hot fixing portion temperatures by burning retainer and slot burns. The film must be emphasized that the floor section should completely cover the bottom of the tube floor. Special lamination line was flat, with no heat conduction, easy to damage the film and so on. Usually have black and white colors. When used with other plastic rope must not be replaced. Usually every two pull a lamination line between arches, sheds and shed Central head can also be two lines cross each other laminated pull strengthened. Fixed lamination line fishing landing sites. Some farmers hook instead of wood or bamboo, and some use both sides of the shed with stakes vertical pull a lead wire, the lamination line unified fastened on the lead wire. Some farmers also use perforated bottom of the tube arch fixed nails with this nail to tie lamination line. Although the effect of these methods almost, but the cost is reduced a lot. 8 single building layout should shed north-south as well. In addition to the base to be considered fertile soil loose, flat, adequate lighting and other factors, but also consider the park better water conditions, conducive to irrigation and drainage. Also note that the traffic is convenient and easy to manage. |
Admin>>>
You are the 24239 visitor
Copyright © GuangDong ICP No. 10089450, Anyang County Agricultural Technology Extension and Service Co., Ltd. Mastery All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 24239 visitor
Copyright © GuangDong ICP No. 10089450, Anyang County Agricultural Technology Extension and Service Co., Ltd. Mastery All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility